The Right Job. At The Right Price. Done Right Away.Free Estimates
License CFC1432590
Free Estimates
Urgent Call?(786) 881-0045
Free EstimateUrgent Call?(786) 881-0045

Cast Iron Pipe Replacement in Coral Springs

New PVC in, then the old cast iron out, without breaking the floors.

We replace failing cast iron drain lines from outside the house, through a tunnel under the slab, so the floors inside stay as they are.

  • Cast iron replaced with PVC
  • Free estimates
  • Permits and city inspections handled
  • Written 10 year warranty, transferable

We replace the pipe. We do not line it. Compare the methods

Older Houses in Coral Springs

County property records show 3,606 single family houses in Coral Springs built in 1975 or earlier. After 50-plus years cast iron corrodes from the inside out, and a camera inspection confirms whether it's time to replace.

14%
of the 25,205 single family houses in Coral Springs
860
of them were built in 1973 alone
3,840
more, built from 1976 to 1980, turn 50 by 2030
BuiltHousesShare
1969 or earlier3219% of them
1970 to 19753,28591% of them

Broward County Property Appraiser tax roll as of September 2024. Single family houses only.

Where They Are

Some of the recorded subdivisions that hold them:

SubdivisionHouses built 1975 or earlier
Coral Springs Country Club Subdivision517
Ramblewood331
Chevy Chase255
The Dells225
The Windings217
Forest Hills South211
Forest Hills172
Glenwood Subdivision164

From the county's recorded plat names. Numbered sections and additions are counted with their subdivision.

Old cast iron pulled out from under a house

Free Estimate

Tell us what is happening and Jordan calls you to set up your free estimate.

What type of job?

Or call (786) 881-0045, or text a photo.

If there's a problem with the work, call and Jordan will fix it.

We Work Under The House, Not Through It

Your floors, tile and kitchen stay where they are. The yard is dug open to the line and the tunnel runs only under the slab. The new line is in and connected before the old one comes out, so the house keeps draining the whole way through.

A cutaway drawing of a house: the yard dug open to the drain line, a tunnel only under the slab, the new white line hung from the slab and connected while the old rusted cast iron comes out below it, pea gravel at the far end.
  1. 1Camera InspectionA camera shows where the cast iron has failed before anything is dug.
  2. 2Yard Trenched, Slab TunneledWith the permit pulled, the yard is dug open to the line. The tunnel runs only under the slab, by vacuum, from the pit at the house.
  3. 3New PVC In, Then Old Iron OutThe new line goes in first, hung on stainless steel hangers and connected. Only then does the old cast iron come out, so your plumbing works the whole time.
  4. 4City InspectionThe city inspects the new line before the tunnel is filled.
  5. 5Pea Gravel BackfillThe tunnel is filled with pea gravel, blown in under the slab.
  6. 6Yard RestoredSod, pavers and plants put back, and the site cleaned each day.

From Your Neighbors

Part of the work involved digging a trench in my front lawn. When completed the trench was filled in and grass replaced.

Dan M.Google review, May 2026

Read the reviews

Broward County

We work across Broward County.

How tunneling works · Compare the methods · All service areas

Cast Iron Backing Up? Call Jordan.

Call (786) 881-0045
(786) 881-0045 EstimateText us