Vacuum Truck Tunneling
What Speedy Piper doesA pit is dug beside the house and a tunnel is dug under the slab with a vacuum truck. The old cast iron comes out, new PVC goes in on stainless hangers, and the whole tunnel is backfilled.
Camera Inspection
A camera goes through the line first, and the recorded video is sent to you.
Access Pit
A pit is dug outside, beside the house.
Tunnel Under the Slab
The tunnel is dug under the slab with a vacuum truck. Floors stay as they are.
New PVC Hung First
The new PVC is hung on stainless hangers before the old cast iron is disconnected, so a house, a business or any other building never loses the use of its plumbing.
Old Cast Iron Out
The old cast iron is pulled out and hauled away.
City Inspection
The city inspects the new line.
Pea Gravel Backfill
The whole tunnel is backfilled with pea gravel, not only the entrance.
Yard Put Back
The yard and the outside of the house are put back just like we found them.



